Tenant servicesAcquisitionsCareersDeutsch
Send an enquiry info@balandra.de
Balandra Infrastructure

Colocation and edge data centres

We develop, build, lease and operate data centres of 1 to 10 MW, in existing buildings and as new builds. Our focus is on the change of use of existing buildings and brownfield sites.

6data centres planned, built and commissioned
around 500server racks delivered
1–10 MWsize of our projects
Classes 1–4We build to all availability classes of EN 50600
Who we are

Data centres in existing buildings and as new builds

Balandra Infrastructure combines the real estate experience of the Balandra Group with ten years of hands-on work in data centre construction. In existing buildings, the connected load already in place is the basis: we start with the available capacity and expand where possible.

We have the Balandra Group behind us, with around 30 staff in Berlin and Bochum.

Our goal: a future-proof use that suits the property and its location.

Everything under one roof

Development, construction, leasing and operation.

Existing buildings and new builds

On new plots, in existing buildings and at commercial and industrial sites.

Using existing capacity

Starting with the existing connected load, expanding where possible.

Real estate expertise

Experience across office, retail, residential and data centres.

German market

Rising demand meets scarce supply

New capacity finds tenants immediately: the market is growing at double-digit rates, and the existing stock is virtually fully leased. To provide new capacity, colocation and edge operators need many smaller sites close to their users.

2,980 MW

in operation at the end of 2025, up 9% on the previous year; around 5,500 MW of new projects in planning

+11%

capacity growth per year until 2030, and the pace is increasing

0.9%

vacancy in Berlin data centres, 3.1% in Frankfurt

Remote working is changing the office, retail is moving online, and cloud, AI and connected machines need data centres close to their users.

Sources: Bitkom and Borderstep Institute, Rechenzentren in Deutschland, Update 2025 (10 November 2025); Borderstep Institute; JLL, EMEA Data Centre Report Mid-Year 2026.

For the city and the building

Using waste heat, preserving buildings

Data centres close to their users fit into existing buildings: they are barely noticeable from the outside, use existing power connections and bring vacant space back into use. The building itself is preserved.

The waste heat can be used to heat the rest of the building; surplus heat goes to neighbours via a local heating network or into the district heating network. In one of our reference projects, a local heating network uses the waste heat for adjacent office buildings and lowers their operating costs.

Mixed use, rethought

One building, several uses that support each other:

  • Residential: for example modern short-stay apartments or housing suited to older people
  • Services: food and drink, fitness, medical practices for residents and the neighbourhood
  • Integrated data centre: uses the existing power capacity and supplies heat for the building

A data centre should be considered in every change of use.

What matters

Power connection and planning law come first

Exclusion criteria

  • Power connection: capacity and scope for expansion
  • Planning law: development plan (Bebauungsplan), zoning category and noise regulations (TA Lärm), building permit

Important for the business case

  • Structure: roof and floor loads
  • Ceiling heights in the building shell
  • Data networks: local fibre connectivity
  • Security: access control and physical protection

Power and planning law open the door; success depends on all the criteria taken together.

Do you own land or a building with a high connected load? We will work with you to assess whether and how a data centre can be developed there.

Offer a site
References

Six data centres built and commissioned

We support data centre projects from planning through construction and project management, commissioning and acceptance to certification. Built from an operator's perspective: our references are based on practical experience in operating data centre infrastructure. We plan every data centre with its future operation in mind, for systems that have to run around the clock.

No.ProjectScopeOur role
01Industrial data centre · 2.5 MVA · based on Tier 1190 server racks · single power supplyJoint planning, construction and project management, commissioning, technical operation
02Leased data centre · 800 kVA · based on Tier 280 server racks · dual power supplyConstruction management, commissioning, preparation for certification, technical operation
03Leased data centre (Tier 3) · 600 kVA · several expansion phases80 server racks · expansion during live operation · power distribution extended during operationOverall project management, construction management, commissioning, preparation for certification
04New-build data centre, site A · up to 1.2 MVA · highest class (availability class 4 to EN 50600) in a geo-redundant pair50 server racks · from groundbreaking to key handover · local heating networkOverall planning, construction and project management, preparation for certification
05New-build data centre, site B · up to 1.2 MVA · highest class (availability class 4 to EN 50600) in a geo-redundant pair50 server racks · built in parallel · dual redundancyOverall planning, construction and project management, preparation for certification
06High-rise data centre · 800 kVA · Tier 3 · phase 146 server racks · power supply and all technical signalling redundant, with bypassJoint planning, construction and project management, commissioning, preparation for certification
Shell construction of a data centre
Shell construction phase
Completed data centre building
Completed building
Structured cabling above server racks
Structured cabling
Dual power supply for each server rack
Dual power supply per rack

Existing sites and leased data centres

Up to 2.5 MVA, built and expanded during live operation. Three data centres with different availability levels, all delivered in compliance with the standards.

Project 01 · Industrial data centre

190 server racks · 2.5 MVA · basic availability (Tier 1)

  • Large industrial company in Germany: continuously available data centre for critical IT
  • Power: 2,500 kVA capacity, 3 standby generators, 6 battery backup systems (UPS), connection to the existing installation
  • Cooling: 12 air-conditioning units, 4 dry coolers, separated hot and cold airflow
  • Commissioning with an integrated test of all systems

Role: joint planning, construction management, commissioning, acceptance, preparation for certification, project management, technical operation

Highlight: Accepted in compliance with the standards and fully documented to ISO 9001. Tailored fire protection, industrial-grade security and professional commissioning management.

Project 02 · Data centre for lease (colocation)

80 server racks · 800 kVA · medium availability (Tier 2) · dual power supply

  • Data centre operator in Germany: new data centre for multiple tenants, all systems designed with dual redundancy
  • 2 standby generators and 2 battery backup systems secure both power paths
  • Cooling: 4 air-conditioning units and 2 dry coolers, designed with dual redundancy
  • Gas fire suppression system that puts out fires without water; phased commissioning on a tight schedule

Role: construction management, commissioning, integrated systems test, acceptance and preparation for certification through to technical operation

Highlight: Zoned access and separation of tenants down to the individual server rack: secure, reliable and ready for multiple tenants.

Project 03 · Leased data centre with certification to EN 50600 (TÜV TSI Level 3)

80 server racks · 600 kVA · several expansion phases

  • All work carried out during live operation, without affecting customer systems and in compliance with the certification
  • Expansion to 80 server racks, two standby cooling units instead of one, new battery backup system (600 kVA), gas fire suppression system
  • Extended lightning protection with risk analysis and surge protection

Role: overall project management, construction management, commissioning, acceptance, preparation for and support with certification to EN 50600 (TÜV TSI Level 3) for the client

Highlight: Main power distribution extended during live operation: completed without interrupting customer systems and without incidents.

New builds and complex sites

Two geo-redundant twin buildings and a high-rise: turnkey new builds with the highest availability and a Tier 3 fit-out, fully documented.

Project 04 · New-build data centre, site A

50 server racks · 400 kVA, expandable to 1.2 MVA · highest class (availability class 4 to EN 50600) in a geo-redundant pair

  • Operator of critical IT infrastructure in southern Germany
  • From groundbreaking through shell construction and the complete building services to key handover
  • Power supply fully duplicated; air-conditioning units for outdoor temperatures above 40 °C
  • Phased commissioning, integrated systems test, complete documentation

Role: overall planning, construction and project management through to turnkey handover, preparation for certification to EN 50600 (TÜV TSI Level 3)

Highlight: A local heating network uses the data centre's waste heat for adjacent office buildings and lowers their operating costs.

Project 05 · New-build data centre, site B

50 server racks · up to 1.2 MVA · highest class (availability class 4 to EN 50600) in a geo-redundant pair · built in parallel

  • Identical twin of site A: both sites form a joint system with dual redundancy
  • Joint fire protection and standby power concept for both sites
  • Both built in parallel, with deadlines met and quality maintained throughout

Role: overall planning, construction and project management through to turnkey handover, preparation for certification to EN 50600 (TÜV TSI Level 3)

Highlight: The joint fire protection concept only achieves the required safety level through the combination of both sites.

Project 06 · High-rise data centre

46 server racks · 800 kVA · Tier 3 · dual power supply · phase 1

  • Tier 3 data centre in an existing high-rise building
  • 9 cooling units directly between the server racks; gas fire suppression system
  • Power supply, cable routes, instrumentation and control systems and leak sensors fully built into supply paths A and B; dedicated switchover units for the in-row coolers: if one fails, path B takes over automatically

Role: joint planning, full construction management, project management, phased commissioning, integrated systems test, documentation, preparation for certification to EN 50600 (TÜV TSI Level 3)

Highlight: Everything duplicated, right down to the leak sensors: Tier 3 quality in an existing high-rise building.

What we deliver
  • Planning, project and construction management
  • Commissioning, acceptance and preparation for certification
  • Security concepts, especially for existing buildings
  • Finding tenants for your site
Who we work for

Who we develop data centres with

Ownersof land and of commercial and industrial buildings: we develop sites together with you.
Operatorsof colocation and edge data centres: sites with connected load, planned and built from an operator's perspective.
Investorsin digital infrastructure: projects of 1 to 10 MW with a team from construction and operations.
Municipalities and municipal utilitiesMaking use of vacant space, recovering waste heat, deploying grid capacity sensibly.
Managing directors

Ten years of hands-on work in data centre construction

We have been responsible for data centres from planning and construction management through to acceptance, and we know what live operation requires. In addition, we have close contacts with colocation and edge operators, specialist planners and contractors.

We invest in projects ourselves and develop sites together with property owners and landowners.

Owners, operators and investors speak directly to our managing directors.

We work across Germany and are currently involved in numerous change-of-use projects for owners and investors.

Alexander SchubringAlexander SchubringManaging Director
Stefan KubeStefan KubeManaging Director
Sascha GiestSascha GiestManaging Director
Offer a site or discuss a project

Speak directly to our managing directors

info@balandra.de

Or use the form. We will get back to you promptly, confidentially and without obligation.

Address
Balandra Infrastructure GmbH
Sickingenstraße 70, 10553 Berlin, Germany